• Application of Natural Channel Design principles
• Restoration of sensitive aquatic habitats
• Control of risk to property and infrastructure

Ecosystem Recovery and
Stream Restoration

• Erosion risk and hazard assessment
• Geomorphic systems understanding
• Groundwater-Surface water interaction

Fluvial Geomorphology

• Field inspections and inventory
• Capital project planning
• Database development

Erosion Inventory
and Assessment

• Analysis of physical and hydraulic barriers
• Design of effective fish passage measures

Fish Passage Design

• Analysis, planning and design of SWM features
• Policy and program development
• Construction review

Stormwater Management

• Individual or Class Environmental Assessment process
• Public consultation
• Agency liason and coordination
• Concept plans and project file documentation

Environmental Assessment

• Condition survey and assessment
• Capital project planning
• Operations and maintenance planning

Dam and Dyke Management

• Development, Interference with Wetlands, Alterations to Shorelines and Watercourses
• Environmental Compliance Approval
• Fisheries Act Authorization
• Navigable Waters Protection Act Approval
• Technical studies and investigations to support permitting processes

Environmental Approvals and Permitting

• Tendering and contract administration services
• Erosion and sediment control
• Protection of sensitive habitat

Construction Management

Arrow
Arrow

ArrowArrow

Ecosystem Recovery and Stream Restoration
Fluvial Geomorphology
Erosion Inventory and Assessment
Fish Passage Design
Stormwater Management
Environmental Assessment
Dam and Dyke Management
Environmental Approvals and Permitting
Construction Management
Slider

Announcements

March, 2018

Ecosystem Recovery Inc. currently has both junior and intermediate positions available for the Kitchener and London offices. Please refer to the job postings on our Careers page.

March, 2018

Ecosystem Recovery Inc. is proud to announce that Chris Moon, P.Eng., has joined our team as a Senior Project Manager and will also manage our new downtown London office.

January, 2018

Our team will be attending the TRIECA Conference at the Pearson Convention Centre on March 21st and 22nd, and we’ll also be at the Conference on Natural Channel Systems in Guelph May 23rd to the 25th. We hope to see you there.

April, 2017

We have officially changed our location! We are now located at 80 Courtland Avenue E Unit 2 in Kitchener, and are no longer at the Parkside location in Waterloo.